Rajuk Uttara Apartment Project7 min read

What the project provides: buildings, flats and facilities

Everything RAJUK’s revised prospectus (November 2024) says each building, each flat and the project grounds come with — room sizes included, on one page.

How big the project is

Sector 18, Uttara is divided into three blocks. Block ‘A’ has 6,636 flats of 1,654 sft; according to the prospectus construction is nearly complete and most flats have been allotted and handed over. 55% of the project land is left open for playgrounds, parks, green space and roads, and the landscaped area is about 17.174 acres.

Each building

  • 16 storeys including one basement, RCC frame structure.
  • Car parking in the basement and on the first floor; the 14 floors above each have 6 flats — 84 to a building.
  • One main staircase, two fire-escape staircases and two passenger/bed lifts.
  • A 250 kVA standby generator, an 800 kVA substation, a 20 kW solar system and lightning protection.
  • CCTV, a fire-fighting system, and emergency lights and fans on the generator.
  • A sewage treatment plant (STP), rainwater harvesting, and power brought in by underground cable.
  • On the ground floor: a multipurpose hall, guard room, reception lobby, drivers’ waiting room and toilets; marble in the lift lobby.

Inside the flat: room sizes

Every flat is 1,654 sft gross — 1,276 sft net and 378 sft common space. The unit plan in the prospectus gives the rooms as (feet-inches):

  • Living 12′-11″ × 11′-3″; dining 12′-4″ × 11′-8″; family living 9′-7″ × 7′-6″.
  • Three bedrooms: 10′-10″ × 12′-6″, 9′-5″ × 12′-11″ and 10′-10″ × 11′-3″.
  • Kitchen 7′-6″ × 7′-1″.
  • Three toilets of 7′-1″ × 4′-7″ each, and a servant’s toilet of 3′-9″ × 3′-4″.
  • The verandas marked on the plan are 3′-4″, 4′-2″ and 4′-7″ wide.

These are worth having before buying furniture: a king-size bed in the 9′-5″-wide bedroom leaves very little room to walk either side. As-built dimensions can differ slightly, so measure your own flat before a large purchase.

Finishes and materials

  • Floors: 600 × 600 mirror-polished tiles.
  • Bathrooms: local-brand glazed porcelain WCs, basins and tiles.
  • Walls: plastic paint inside, weather coat outside.
  • Door frames in teak chamble; the main entrance door is designed Chittagong teak.
  • Windows: aluminium sliding, clear glass.
  • Kitchen: glazed wall tiles, a granite-topped concrete shelf and a stainless-steel sink.
  • Gas: LPG piped to each flat from a cylinder bank (a reticulated system).

For upkeep, that means caring for polished tiles and grout, damp on painted walls, and bathroom fittings — each covered step by step in our maintenance library (ruap.net/en/maintenance).

Water, design and structure

  • Dhaka WASA supplies water from deep tube wells, using the District Metering Area (DMA) approach and HDPE pipe to cut losses.
  • Architectural design by professional architects of the Department of Architecture; structural design by structural designers of the Public Works Department.
  • Soil tested through the Housing and Building Research Institute, and the structures designed to the Bangladesh National Building Code with its earthquake parameters.

Facilities on the grounds

  • A five-storey central mosque for about 7,500 worshippers at once, with separate space for women (about 400) and for older worshippers.
  • A two-storey temple with a basement.
  • A commercial complex and convention hall on 118 katha: 10 storeys plus a basement, with parking, a convention hall, supershop, shops and showrooms and ATM booths; the fourth floor is allotted to a healthcare provider.
  • A children’s park of about 0.66 acres with a cycle track and play equipment.
  • A swimming pool with a baby pool and jacuzzi; a health club with separate gyms for men and women.
  • A central library and a 74.32 m² roller-skating rink.
  • School, college, playgrounds and a kitchen market/supershop; LED street lights imported from Europe on the internal roads.

Who runs it, and who repairs it

Under the prospectus, each building must form a management committee from among its allottees, by election or selection. The committee collects a monthly service charge and runs the repair and upkeep of common services — substation, lifts, generator, water pumps, STP — following RAJUK’s guidelines.

What is listed here is what the prospectus declares. Which of it is working in a particular building today can differ — ask your own building’s committee.

advertisement

Common questions

How many flats are in each building?
84 — six on each of 14 residential floors. The basement and first floor are for parking and other facilities.
How many lifts and generators does each building have?
According to the prospectus, two passenger/bed lifts and one 250 kVA standby generator.
How big are the bedrooms?
The unit plan gives the three bedrooms as 10′-10″ × 12′-6″, 9′-5″ × 12′-11″ and 10′-10″ × 11′-3″.
How does cooking gas arrive?
As LPG piped from a cylinder bank — it comes through a pipe, but it is not natural gas.
Who maintains the building’s facilities?
Under the prospectus, the building’s management committee, from the allottees’ monthly service charge.

Sources

The facts in this guide were checked against these sources.

  1. Prospectus for flat allotment, Block ‘A’, Uttara Apartment Project, Sector 18, Uttara (revised) — Rajdhani Unnayan Kartripakkha (RAJUK) (published November 2024).